Filter

Role 2 Base Medical Treatment Facility

This project involves the design and construction of Role 2 Base Medical Treatment Facility in Kosovo, spanning approximately 700m² across two levels. The facility is designed to support advanced medical operations.

Restore Electrical Distribution System, APOD, Pristina, Kosovo

This initiative encompassed the modernization of the Camp’s power infrastructure, shifting from reliance on fossil fuels to integration with the local power distribution system.

Rotary Wing Deployed Operating Base

This project involves the construction of a 1,900m² reinforced concrete platform and a 1,600m² asphalt taxiway, providing critical infrastructure for the Rotary Wing Deployed Base of the US Army Forces in Kosovo.

Project 131, at Camp Bondsteel, Kosovo

This development comprises 8 living accommodation buildings and 1 multi-purpose facility building, all constructed using stacked container structures.

Power System Modernization, Camp Bondsteel, Ferizaj, Kosovo

Design and Build of the Power modernization Project for the entire Camp.This project transformed the operation of the Camp from being dependent on fossil fuel for electrical energy, to being connected to the main local power distribution system.

Role 1+ Medical Treatment Facility

This project was implemented in 2022 in a record breaking 3 weeks, from breaking the ground to FOC.